Taiwan, May 2017. Nukote Coating Systems Taiwan distributor, Integral Firetek, was awarded the key infrastructure improvement contract for the Nanhua reservoir project.  The project consists of a 9-meter diameter penstock system of approximately 2000 lineal meters,  for use in draining silt laden water from the reservoir after Typhoons.  Nukote and Firetek worked with the client and general contractor to develop a Nukote Aegis® Liner system specific to the requirements of this project.  Water velocities of 30 m3 per second combined with silt content of 20% were among the many design obstacles overcome prior to the contract award.